PROJECT SCOPE / ENGINEERING INTERFACES
Bring material, process and equipment requirements into one discussion. Define each supply and site responsibility before agreeing a project.
Discuss your requirementsROCKPEAK / SCOPE
The company materials describe crushing and screening equipment and turnkey production-line solutions. The dedicated product documents describe installation drawings, operating manuals, remote guidance and project-arranged site supervision and training.
| Interface | What the supplied documents support | What must be agreed |
|---|---|---|
| Engineering | Equipment configuration and installation drawings are listed. | Full process design and design liability pending. |
| Procurement / supply | Three documented fixed-machine models. | Full bill of equipment, purchased packages and exclusions pending. |
| Construction / site | Site supervision may be arranged by project. | Civil, structural, electrical and construction contracting responsibility pending. |
Pending confirmation. The materials do not establish a complete engineering, procurement and construction contract or a single-point performance guarantee.
ROCKPEAK / PROJECT INPUTS
Type, hardness, abrasiveness, moisture, clay and contaminants.
Maximum lump size, feed gradation, required hourly throughput and final sizes.
Location, layout, power supply, existing machines and logistics conditions.
Required equipment, installation interfaces, site support and acceptance scope.
ROCKPEAK / ENGINEERING
A jaw-based circuit may combine feeding, primary crushing, secondary reduction and screening. Cone circuits can include return of screen oversize; recycling circuits require sorting and contaminant removal. Equipment capacities and transfer interfaces must be matched.
Product sources list installation drawings and operating manuals. The package contains no issued engineering deliverable set.
Pending confirmation. Process guarantees, mass balance, civil and electrical design, drawing list, approval process and local design responsibility.
ROCKPEAK / PROCUREMENT
The documented portfolio comprises RP-JC-1200 Jaw Crusher, RP-CC-300 Cone Crusher and RP-IC-1315 Impact Crusher. Feeding, screening and conveying interfaces must be reviewed for the intended circuit.
Product documents describe export packing and destination-specific shipping arrangements. The stated 30–45-day machine lead time is subject to the agreed order schedule and is not a complete-line delivery commitment.
Compare documented equipment →Pending confirmation. Final bill of equipment, third-party procurement, vendor qualification, spares, shipping responsibilities and project delivery schedule.
ROCKPEAK / SITE INTERFACES
| Workstream | Source context | Unresolved boundary |
|---|---|---|
| Civil / foundation | Foundation design must account for site conditions. | Responsible party, loads, drawings and site construction not supplied. |
| Electrical / controls | Final motor configuration requires a technical proposal. | Power distribution, controls, cabling and local compliance pending. |
| Mechanical installation | Source lists installation drawings and project-arranged supervision. | Labor, lifting equipment, site safety and installation contractor pending. |
| Permits / local duties | No allocated responsibilities supplied. | Permits, destination rules, inspections and local authorities pending. |
ROCKPEAK / COMMISSIONING
Remote technical guidance is listed in the product documents. On-site supervision and operator training can be arranged for the project.
Pending confirmation. Attendance duration, travel costs, start-up conditions, operator responsibilities, training deliverables and performance-test duties.
ROCKPEAK / DELIVERABLES
| Item | Details |
|---|---|
| Technical documents | Drawing register, configuration, interfaces and revision control. |
| Inspection / testing | Inspection plan, test conditions, records and sign-off. |
| Site handover | Installation completion, safety prerequisites and commissioning boundary. |
| Acceptance | Measured outputs, feed conditions, test method, exclusions and responsible signatories. |
Pending confirmation. No agreed deliverable register, project acceptance criteria, guarantee, penalty or warranty schedule was supplied. This table is a discussion checklist, not an existing service commitment.
ROCKPEAK / EVIDENCE

The current package supports equipment specifications and product-level operating guidance. It also contains project narratives, but customer identity, publication rights and result evidence remain unresolved.
Pending confirmation. Cleared case studies and signed EPC responsibility or acceptance documents. No project result or site identity is inferred from this image.
ROCKPEAK / FAQ
No. Product sources state that capacity depends on feed, settings and operating conditions. The whole circuit needs its own review.
That responsibility is not established by the supplied materials. Agree the construction and utility boundary in writing.
Material properties, feed size, target throughput, output sizes, project location and the requested supply and site-service boundary.
08 / PROJECT INQUIRY
Share the project conditions so equipment and scope can be discussed together.
No. 88, West 4th Ring Road, Zhengzhou, Henan, China
Mon–Fri · 09:00–18:00 (UTC+8)
Contacts follow the supplied document; reachability and mailbox delivery have not been tested.
PROJECT INQUIRY
Tell us about the material, output and scope you need.
View the full project enquiry section